Geoinformatics and Surveying project topics and materials free Download in PDF & DOC for Nigeria

List of Geoinformatics and Surveying project topics and materials free Download in PDF & DOC for Nigeria. Our Final year Diploma, Degree, Masters, thesis Geoinformatics and Surveying research works materials starts from Abstract, Chapter 1-5, references and more. Get undergraduate projects for ND, HND, NCE, BSC, BED, MSC, MBE, PHD and PGD students. We offer Qualitative & Quantitative data analysis, using any package (SPSS, RStudio, eviews, Stata, JMP, OriginPro, GNU Octave, matlab, microsoft excel, Minitab). Hire a professional Geoinformatics and Surveying writer/researcher for projects, masters thesis, journals and assignments at low cost. Sell your Geoinformatics and Surveying project materials on projectslib.com

  • Compare
  • Compare
  • Compare
  • Compare
  • Compare
  • Compare
  • Compare
  • Compare
  • Compare
  • Compare
  • Compare
  • Route survey alignment design and volume computation of Saabo Eleke road from Oranyan junction to Olorunla village, Atiba local government area, Oyo state

    01

    ABSTRACT

    This research is on Route survey alignment design and volume computation of Saabo Eleke road from Oranyan junction to Olorunla village, Atiba local government area, Oyo state. This project was centred on route survey, design and volume computation of Oranyan – Olorunla village road, Atiba local government areas, Oyo state, Nigeria. The project was executed in order to provide relevant information on the route for construction purpose. The survey operations was carried out to achieve the aim; which included reconnaissance, marking of chainage distance, establishment of controls and data capture(geometric and attribute) along the route using a single frequency CHC Global Positioning System (GPS) receivers, Leica T.S together with Sokkia set Total Station. The final coordinates were used to produce detail, a profile and cross-section plan, the designing of the route was also done and the volume of earthwork for cut and fill was calculated. Lastly, plans showing the aforementioned drawings were produced in softcopy and hardcopy formats after which a comprehensive technical report was written on the executed project. I hereby recommend that the survey information obtained as well as the route design carried out in the course of this project execution should be used in the construction and rehabilitation of the said route.

    Compare

Main Menu