Home
Shop

We can buy from other sites for you 

09036857618

Design and construction of office complex for school of environmental design technology

3,000.00

Description

Abstract

As students of Building Technology Department in School of Environmental Design Technology, in Federal Polytechnic Nekede, we have gotten to the level which our faculty needs an office complex block like other faculties in other technologies. This office block contains Dean office, H.O.D, Chief Lecturers, Senior Lecturers, other Lecturers, Security office, conference hall, toilets, stores and other important things. This is to make sure that all the staffs in this faculty will be in one office block for easy location and easy to pass information. Also to unite them as one faculty. The integrated project in the design and construction of office block complex for School of Environmental Design Technology was successfully carried out with strict and close supervision of our supervisor. We recommend that the block work should be laid in stretcher bond with cement sand at the ratio of 1:6 and the hollow of concrete block should be filled with weak concrete to ensure adequate strength and rigidity.

WE CAN GET ANY MATERIAL FOR YOU

Do you want a project Material different from this, Contact us

Reviews

There are no reviews yet.

Be the first to review “Design and construction of office complex for school of environmental design technology”

Your email address will not be published. Required fields are marked *

Back to Top
Product has been added to your cart
×