Home
Shop

We can buy from other sites for you 

09036857618

Design and Implementation of Production Control System ( Case Study of Seven Up Bottling Company)

3,000.00

Description

Abstract This project will be centered on the production control system. This production control system being operated manually ad due to the numerous problem encountered and over payment. A design was taken to computerized in order to check this problem the problem were identified after series of interviews and examination of document after which analysis will be made and a computerized procedure recommended. This project will also suggest how to successfully implement the computerized procedure and to overcome the obstacle that would hinder the successful implementation of the system. The new system was developed using visual basic 6.0 and access database. This language was chosen because of its easy syntax and features for developing windows based applications. 

WE CAN GET ANY MATERIAL FOR YOU

Do you want a project Material different from this, Contact us

Reviews

There are no reviews yet.

Be the first to review “Design and Implementation of Production Control System ( Case Study of Seven Up Bottling Company)”

Your email address will not be published. Required fields are marked *

Back to Top
Product has been added to your cart
×