Design and Implementation of Production Control System ( Case Study of Seven Up Bottling Company)

3,000.003,200.00 (-6%)

Sold By: Brilliantng

In stock

SKU: PL96862 Category: Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
Report Abuse
Help us Grow
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
5 / 100
Our Score
Click to rate this post!
[Total: 0 Average: 0]

Abstract This project will be centered on the production control system. This production control system being operated manually ad due to the numerous problem encountered and over payment. A design was taken to computerized in order to check this problem the problem were identified after series of interviews and examination of document after which analysis will be made and a computerized procedure recommended. This project will also suggest how to successfully implement the computerized procedure and to overcome the obstacle that would hinder the successful implementation of the system. The new system was developed using visual basic 6.0 and access database. This language was chosen because of its easy syntax and features for developing windows based applications. 

Be the first to review “Design and Implementation of Production Control System ( Case Study of Seven Up Bottling Company)”

Reviews

There are no reviews yet.

Vendor Information

  • Store Name: Brilliantng
  • Vendor: Brilliantng
  • No ratings found yet!

Main Menu

Design and Implementation of Production Control System ( Case Study of Seven Up Bottling Company)

3,000.003,200.00 (-6%)

Add to Cart
{"cart_token":"","hash":"","cart_data":""}
%d bloggers like this: