Home
Shop

09036857618

Showing 1381–1400 of 2842 results

Show

The effects of a well planned purchasing function in the attainment of organizational desired objectives

projectslib9433337996
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

The impact of interim valuation-certificate in construction project delivery

projectslib7393837995
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

The effect of maintenance cost on the rent of commercial buildings - a case study of some selected buildings in Kaduna state

projectslib7319837994
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

The effects of existing bid selection on public buildings construction projects in Kaduna state

projectslib2829137984
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Involvement of quantity surveyor in railway construction project cost in the Nigerian railway corporation, Niger state

projectslib5363837998
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

An assessment of the participation of female quantity surveyor in professional practice in Bida and Minna areas of Niger state

projectslib9237437997
This project is on An assessment of the
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Estimating and budgeting a medium scale building project

projectslib9148637981
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

The comparative analysis of recreational facilities for housing estates

projectslib2688137992
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Taking off processes and preparation of an un-priced bill of quantities

projectslib5211337985
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Assessment of the environmental impact of construction works

projectslib9256837989
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Productivity improvement of projects in the Nigerian construction industry

projectslib4714437990
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Risk management practice in construction project (a case study of Ebonyi state)

projectslib1354137979
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Assessment of factors influencing time performance of building projects in Nigeria construction industry

projectslib9322837987
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Appraisal of cost management practices in the delivery of capital projects in Nigeria

projectslib9447737980
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

An examination of the role of value engineering analysis in the construction industry

projectslib5774937978
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Microbial load of some dehydrated foods with special reference to dried tomatoes and mushrooms

projectslib2183637820
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Production of potassium salt K2So4 from agricultural waste unripe plantain peels

projectslib3993337829
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

The assessment of surface water quality in Otamiri river in Nekede, Owerri west, Imo state

projectslib8313637831
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

Theory and application of direct hydrocarbon indicators

projectslib2865137819
Original price was: ₦3,200.00.Current price is: ₦3,000.00.

A study on the effects of beer on the efficacy of antimalarial drug administered 1hour before beer consumption in albino rats

projectslib2995737821
Original price was: ₦3,200.00.Current price is: ₦3,000.00.
Back to Top
Product has been added to your cart
×